
Airplanes getting ready for take off on new shortened Runway 10-C right around 6 a.m.

Construction crew working away through the night to get the job done before 6:00 a.m.

Fresh green paint to mimic grass on previous safety area, after runway 10-C was shortened.
Advertisement
Like this:
Be the first to like this post.